(click on images to enlarge)

 

 

 

Intake Chamber; water flows through the trash gates to filter debris, then fills the intake chamber, a required 2cfs then exits through the small pipe below and deposits back into the creek, while the rest of the water goes through the penstock and is used to generate electricity